Pieux Dumontreal Inc. is the leader in impact driving-piles.

The very high price and scarcity of suitable sites is forcing contractors to build on soils with very low bearing capacity. Using pile foundations for building construction (commercial, industrial and residential) is essential to ensure greater strength and stability, regardless of the type of soil.


Pieux Dumontréal Inc. is equipped with specialized pile-driving machinery and has a talented technical team that can meet the demands of this constantly growing market. We offer services for different types of pile foundations and retaining walls to suit your needs for residential, commercial, industrial and civil engineering construction projects.


Call us so that we can offer you a fast and suitable solution for your construction projects. Pieux Dumontreal Inc. is the leader in impact-driven piles and pile installation before construction.


The mechanical excavator equipped with a Side-Grip Movax allows the manipulation of tubular steel piles and sheet piles.
Movax Vibration-driver: Used to drive and install piles by vibration.
Design of retaining walls – soldier piles and lagging.
MTQ projects: impact-driven piles for a pile foundation used to rebuild a bridge.
Impact-driven piles in residential, commercial, industrial and civil engineering projects.
Impact-driven piles make for a solid foundation on which to build.
Steel piles are driven until bedrock or refusal has been reached.
Agricultural project: Installation of driven piles before the construction of silos.
Commercial project: Construction of a 304 condo unit on steel piles.
Construction of a condominium building on steel piles. Driving 53 piles having 4,5 inches in diameter and 64 piles having 5,5 inches.
Civil engineering work: Driving piles for a small bridge under A-15 highway in St-Patrice-de-Sherrington.
Civil engineering work: Driving piles for a small bridge under A-15 highway in St-Patrice-de-Sherrington.
Driving inclined piles.
Construction of retaining walls – soldier piles and lagging.
Agricultural project: Installation of driven piles before the construction of silos and a warehouse.
Pile driving for a single-family residential home with garage. The number of piles can vary between 12 and 30.
Why should you build on pile foundations?? Here is an example of unsuitable ground on which to build conventional foundations...
Pieux Dumontréal guarantees its piling work for a 25 year period.
The length of steel piles is easily adjustable to the field conditions in order to be driven down to bedrock or refusal.
Steel sheet pile construction and driving inclined piles by Pieux Dumontréal.
Piling just 18 inches away from the existing foundations? Not a problem!!
Pile installation allows for the foundation’s footings to be built on piles.